About this deal
Michael is Homebuilding & Renovating's Director of Content, Vice Chair of the self build industry body, the National Custom and Self Build Association ( NaCSBA), presenter of multiple property TV shows and author of Renovating for Profit(Ebury).He also runs an architectural and interior design practice, offering design and project management services. He is one of the country's leading property experts and has undertaken over 30 building projects including two self-builds and the renovation of a Grade-II listed farmhouse.
Electricity and gas don’t usually need to be ducted or installed at this point as they are normally surface mounted. Finally, the building and warranty inspectors will have to approve the excavated foundations prior to any concrete being poured.To cover the entire quay, I use household filler/plaster as it’s cheap, available in large quantities, and you can make it to the viscosity desired by varying the amount of water in the mix. Apply a thin layer of PVA to the quay walls, followed by a generous coating of plaster. Once left to harden (which can be up to 48 hours), sand the plaster until the required smoothness is achieved.
Short bore piles are typically 2–3m long and can be reinforced with steel (Image credit: Homebuilding & Renovating) The rest of England and Wales generally have low plasticity clays but even these still carry some risk.
block paving
The standard foundation solution in most parts of the UK is the strip foundation, also known as strip footings.